GEMProspect IntelligenceGlobal Epicenter of Mobility · Detroit Regional Partnership
Demonstration system seeded with public-source sample data. Every company, signal and figure shown is drawn from the cited public source on its profile — no fabricated data. Prepared by LIFEOFMORR LLC for the Detroit Regional Partnership (DRP) / Global Epicenter of Mobility (GEM).

← All companies

Texas Instruments

Headquarters: Dallas, Texas, USA · Power ElectronicsFit score 91/100

What they do

Texas Instruments designs and manufactures analog and embedded-processing semiconductors, including the power-management devices used across EV powertrains and charging systems.

Expansion / growth signal observed

TI's first Sherman, Texas fab (SM1) started 300mm production in December 2025 — the first of four planned Sherman fabs inside a program of more than $60 billion across seven US fabs, supported by $1.6 billion in CHIPS grants for Sherman and Lehi, Utah.

Signal type: Production start — new fab online inside a $60B+ US build-out · Signal date: 2025-12-17

Source: Nexus Semiconductor — US Semiconductor Fab Investments tracker (TI company announcements, SIA tracker) — 2026-09-09. Read the source →

Fit score — how 91/100 is built

Signal strength
23/25
North America presence / move
23/25
Scale
25/25
Recency
20/25

Scoring rationale: Signal strength 23/25: a new fab in production, with three more on the same site. North America 23/25: Texas + Utah build-out, US-headquartered. Scale 25/25: $60B+ program is among the largest US semiconductor commitments on record. Recency 20/25: December 2025 production start. GEM angle is the automotive power-device supply chain TI feeds, not TI as a relocation candidate.

Scores are analyst-assigned from the cited source only, under the published model on the How It Works page. In the production system every score enters a human verification queue before it is used in outreach.